The cost of skipping consent also shows up in a slower, harder to trace way: initiatives that simply stop growing. This study surveyed 84 experts across ten community conservation initiatives in southern and eastern Africa to identify why so many struggle to scale beyond their pilot stage. Unfair benefit sharing and unequal decision-making were named as the most common bottlenecks, ahead of any ecological or financial constraint. An organisation that has not built consent and shared decision-making into how an initiative runs from the outset is, in effect, building a ceiling into its own programme, one that shows up as stalled growth years after the launch instead of as an obvious early failure.
Citation: Pienkowski, T., Clark, M., Jagadish, A., Albert, A., Brar, M., Breedveld, T., Chinangwa, L., Gohil, D., Irumba, D., Kanaan, R., Kicheleri, R.P., Kihumuro, P., Kiwango, W.A., Mabele, M.B., Matiku, P., Mbeyale, G., Mbuvi, M.T.E., Mugisha, A., Mwango, S., Mwanyoka, I., Nyirenda, R., Oula, G., Pétursson, J.G., Rusoke, T., Turyahabwe, N., Kazungu, M., Mandoloma, L., Meshack, C., Moombe, K.B., Moyo, F., Muposhi, V.K., Ochieng, A., Sabuhoro, E., Spenceley, A., Sulle, E., Tumusiime, D.M., Wilfred, P., Brehony, P., Assef, E.D. and Mills, M. (2026) 'Diagnosing scaling bottlenecks in 10 community conservation initiatives in southern and eastern Africa', Conservation Biology, 40, e70149. doi: 10.1111/cobi.70149.
Link: https://doi.org/10.1111/cobi.70149